R-Series Data Center Products User’s GuideRev G
x • Introduction R-Series Data Center Products User’s GuideWEEE InformationSee “Appendix E.Waste Electrical and Electronic Equipment Directive (WEEE)
76 • Chassis and Blade Installation R-Series Data Center Products User’s Guide
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 77Chapter 4. Hardware Upgrade and Replacement ProceduresThe
78 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s GuideOther components such as the processor or motherboard are
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 79DriversYou can obtain drivers for ClearCube blades from th
80 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s GuideUpgrading MemoryOnly use ClearCube-supplied or ClearCube-a
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 81• You must populate CPU 0 socket first to enable and opera
82 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s GuideModel R3080DThe R3080D motherboard supports DDR3 1333 MHz
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 83Installing 3 DIMMs1. Pull the tabs on either side of the m
84 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s GuideReplacing and Upgrading Hard DisksThe following sections d
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 85• Small tray (part number G0700056)—contains up to two har
R-Series Data Center Products User’s Guide Introduction • xiWarnung zum medizinischen oder klinischen Einsatz von ClearCube-ProduktenClearCube-Produk
86 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s Guide2. Position the blade so the hard disk tray is facing up (
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 877. Place the new hard disk in the tray.– Insert hard disks
88 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s GuideR3080D Hard DiskTo replace or upgrade a 2.5-inch hard disk
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 894. Attach the new hard disk.a. Carefully place the new har
90 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s GuideR3040S FansEach R3040S has two CPU fans:• CPU fan 0, used
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 91Figure 49 The Location of CPU Fan 0, CPU Fan 1, Power Hea
92 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s GuideEnsure that you do not loosen memory modules, voltage regu
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 939. Insert the replacement fan in the fan bracket.a. Rest—b
94 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s GuideR3080D FanThe R3080D CPU fan is attached to the CPU heatsi
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 95.4. Remove the 4 screws from the bracket and remove the br
xii • Introduction R-Series Data Center Products User’s GuideBelow are the graphical symbols that are used on ClearCube Technology, Inc. Products and
96 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s GuideAn indicator on the bottom of the fan shows the direction
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 97Replacing a Front LCD PanelThis section describes how to r
98 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s Guide• R3040S—Insert a screwdriver in the access hole, shown be
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 99shown below. It might help to push up on the lower tab fro
100 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s Guide8. Replace the LCD panel screw, ensuring that the plastic
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 101• R3040S—CMOS battery is located near the rear edge of th
102 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s Guide3. There is a release tab at the top of the battery holde
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 1032. Ensure that you are working with the shorter of the tw
104 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s Guidea. Hold the green interposer so the text and labels on th
R-Series Data Center Products User’s Guide Hardware Upgrade and Replacement Procedures • 105section, “R3040S Interposer Cards” on page 102, to remove
R-Series Data Center Products User’s Guide Introduction • xiiiSafety Guidelines Before undertaking any troubleshooting or maintenance procedure, read
106 • Hardware Upgrade and Replacement Procedures R-Series Data Center Products User’s Guide5. Slowly insert the new fan pack to ensure proper seatin
R-Series Data Center Products User’s Guide Troubleshooting • 107Chapter 5. TroubleshootingIf you have any problems with your system, please check the
108 • Troubleshooting R-Series Data Center Products User’s GuidePower IssuesNo power to PC blade • Check the power button on the front of the PC blad
R-Series Data Center Products User’s Guide Troubleshooting • 109Fiber Optic Troubleshooting No video and/or digital link present • Check all the C/Po
110 • Troubleshooting R-Series Data Center Products User’s Guide
R-Series Data Center Products User’s Guide Appendix A. Specifications • 111Appendix A. SpecificationsR-Series BladesTable 1 PC Blade Specifications
112 • Appendix A. Specifications R-Series Data Center Products User’s GuideR4300 ChassisF6150–160 Fiber TransceiverBIOS• Phoenix® BIOS • Supports PXE
R-Series Data Center Products User’s Guide Appendix A. Specifications • 113Fiber Signal Loss• Maximum signal attenuation through all fiber runs, patc
114 • Appendix A. Specifications R-Series Data Center Products User’s Guide
R-Series Data Center Products User’s Guide Appendix B. Regulatory Compliance • 115Appendix B. Regulatory ComplianceThe products described in this doc
xiv • Introduction R-Series Data Center Products User’s Guide•Live Circuits – Operating personnel and service personnel must not remove protective co
116 • Appendix B. Regulatory Compliance R-Series Data Center Products User’s Guide
R-Series Data Center Products User’s Guide Appendix C. Technical Support • 117Appendix C. Technical SupportContact InformationIn the event any proble
118 • Appendix C. Technical Support R-Series Data Center Products User’s GuideReturn Merchandise Authorization (RMA)ClearCube’s policy for products u
R-Series Data Center Products User’s Guide Appendix C. Technical Support • 119with the Fiber Transceiver. Refer to the Safety Guidelines on page 4 fo
120 • Appendix C. Technical Support R-Series Data Center Products User’s Guide
R-Series Data Center Products User’s Guide Appendix D. Warranty • 121Appendix D. Warranty ClearCube WarrantyFor One to Three YearsPURPOSE. This Clea
122 • Appendix D. Warranty R-Series Data Center Products User’s GuideThe Defective Product must be shipped back to ClearCube within five (5) business
R-Series Data Center Products User’s Guide Appendix D. Warranty • 123GOVERNING LAW. These terms and conditions shall be governed by the laws of the
124 • Appendix D. Warranty R-Series Data Center Products User’s Guide
R-Series Data Center Products User’s Guide WEEE • 125Appendix E. Waste Electrical and Electronic Equipment Directive (WEEE)WEEE InformationThe produc
R-Series Data Center Products User’s Guide Introduction • xvsignification de ces symboles. Les symboles graphiques et leur signification, ci-dessous,
126 • WEEE R-Series Data Center Products User’s GuideInformations sur la DEEELes produits décrits dans ce document sont soumis à la directive 2002/96
R-Series Data Center Products User’s Guide WEEE • 127Elektro- und Elektronikaltgeräten nach deren Lebensdauer zu reduzieren. Diese Richtli-nie tritt
128 • WEEE R-Series Data Center Products User’s GuideLos materiales usados en este producto, si no se descartan apropiadamente, podría tener efectos
Revision GP/N G02007820120810
xvi • Introduction R-Series Data Center Products User’s GuideGuide de sécurité Avant de dépanner ou de commencer des opérations de maintenance, veuil
R-Series Data Center Products User’s Guide Introduction • xviirequis. Pour le remplacement des cordons d'alimentation, consulter Annexe C – Supp
xviii • Introduction R-Series Data Center Products User’s GuideSymbole – Deutsche Symbole auf den Geräten geben dem Benutzer und dem Wartungspersonal
R-Series Data Center Products User’s Guide Introduction • xixSicherheitsrichtlinien Vor der Durchführung von Fehlerbehebungs- oder Wartungsarbeiten s
Technical SupportPlease refer to our support website for technical updates, additional warranty information and documentation, and software revisions:
xx • Introduction R-Series Data Center Products User’s Guidevon Netzkabeln finden Sie im Anhang C – Technischer Support (Appendix C – Technical Suppo
R-Series Data Center Products User’s Guide Introduction • xxiSímbolos – Español Los símbolos se usan en el aparato para comunicar información específ
xxii • Introduction R-Series Data Center Products User’s GuideEstos mismos símbolos se usan en este documento cuando es apropiado para indicar situac
R-Series Data Center Products User’s Guide Introduction • xxiii• Adaptadores de alimentación – ClearCube o distribuidores de ClearCube proveen de ada
xxiv • Introduction R-Series Data Center Products User’s GuideLos dispositivos marcados cumplen con el código federal FDA 21 CFR 1040 por notificació
R-Series Data Center Products User’s Guide ClearCube Architecture and Product Overview • 1Chapter 1. ClearCube Architecture and Product OverviewThe C
2 • ClearCube Architecture and Product Overview R-Series Data Center Products User’s GuideR-Series PC Blade The ClearCube PC blade is a dedicated com
R-Series Data Center Products User’s Guide ClearCube Architecture and Product Overview • 3A display area at the front of each blade provides active s
4 • ClearCube Architecture and Product Overview R-Series Data Center Products User’s GuideFigure 2 ClearCube R-Series Blade Front Panel Display outs
R-Series Data Center Products User’s Guide ClearCube Architecture and Product Overview • 5R-Series ChassisThe ClearCube R-series chassis is a central
R-Series Data Center Products User’s Guide Contents • iiiContentsHow to Use this Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 • ClearCube Architecture and Product Overview R-Series Data Center Products User’s GuideFigure 4 R4300 Chassis Rear ViewC/PortThe C/Port, shown in
R-Series Data Center Products User’s Guide ClearCube Architecture and Product Overview • 7Multi-Video SolutionThe ClearCube multi-video solution prov
8 • ClearCube Architecture and Product Overview R-Series Data Center Products User’s GuideFiber TransceiverThe Fiber Transceiver, shown in Figure 7,
R-Series Data Center Products User’s Guide ClearCube Architecture and Product Overview • 9Zero Clients and Thin ClientsClearCube PCoIP® zero clients
10 • ClearCube Architecture and Product Overview R-Series Data Center Products User’s Guide
R-Series Data Center Products User’s Guide Network Planning and Site Preparation • 11Chapter 2. Network Planning and Site PreparationRack and Cabinet
12 • Network Planning and Site Preparation R-Series Data Center Products User’s GuideFully enclosed electrical cabinets are the preferred option for
R-Series Data Center Products User’s Guide Network Planning and Site Preparation • 13Power and Cooling RequirementsThe ClearCube Support site provide
14 • Network Planning and Site Preparation R-Series Data Center Products User’s GuideIf you are putting multiple chassis assemblies on a single power
R-Series Data Center Products User’s Guide Network Planning and Site Preparation • 15Each fully loaded chassis requires eight C/Port cables with RJ-4
iv • Contents R-Series Data Center Products User’s GuideChapter 3. Chassis and Blade Installation. . . . . . . . . . . . . . . . . . . . . . . . . .
16 • Network Planning and Site Preparation R-Series Data Center Products User’s GuideFigure 12 ClearCube Digital Fiber C/Port Architecture Cabling D
R-Series Data Center Products User’s Guide Network Planning and Site Preparation • 17The following figure shows cabling between PCoIP zero clients an
18 • Network Planning and Site Preparation R-Series Data Center Products User’s Guide
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 19Chapter 3. Chassis and Blade InstallationThe following instructions are
20 • Chassis and Blade Installation R-Series Data Center Products User’s Guide• Monitors and keyboards – Monitors are normally shipped in their own c
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 21Begin installing your chassis assemblies at the bottom of the rack or c
22 • Chassis and Blade Installation R-Series Data Center Products User’s GuideFigure 15 Side View of Chassis Centered in a Two-Post Rack6. Attach th
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 23To install a chassis using the CRM kit, do the following:Figure 16 Rac
24 • Chassis and Blade Installation R-Series Data Center Products User’s Guide4. Pull the rack bracket forward and insert the front rack ears on the
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 25The standard 10-amp power cords are acceptable for use with the Fiber T
R-Series Data Center Products User’s Guide Contents • vR4300 Chassis Upgrade Kit Installation . . . . . . . . . . . . . . . . . . . . . . . . . . .
26 • Chassis and Blade Installation R-Series Data Center Products User’s GuideThe R4300 accepts the modules as shown in the positions in Figure 18.Fi
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 27The first three characters of a module’s serial number, shown on the ba
28 • Chassis and Blade Installation R-Series Data Center Products User’s GuideFigure 21 R4300 Modules The Connect Module (shown on the left in Figur
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 29ADMIN OUT Yellow RJ45 connection that links to the ADMIN IN connection
30 • Chassis and Blade Installation R-Series Data Center Products User’s GuideSTATUS Blue • C/Port connection status — Green = good digital link to b
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 31Table 6 R4300 Remote Management Module FeaturesConnectors Label Colo
32 • Chassis and Blade Installation R-Series Data Center Products User’s GuidePower Modules The R4300 contains two Power Supply Units (PSUs) and a Du
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 33The PSUs are factory-installed, field-replaceable units. Each PSU has a
34 • Chassis and Blade Installation R-Series Data Center Products User’s GuidePrimary, and RMMs on the chain all serve as Tertiary controllers. A Con
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 35blades (configured by daisy-chaining the spare connections). Figure 23
vi • Contents R-Series Data Center Products User’s GuideR3040S Hard Disk Tray, Drive Layout, and SATA Headers on Motherboard. . . . . 85Replacing an
36 • Chassis and Blade Installation R-Series Data Center Products User’s Guidethan one switch and/or subnet to better protect against network-related
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 37We suggest routing the cables down the sides of the rack to the back pa
38 • Chassis and Blade Installation R-Series Data Center Products User’s Guidecontrol. One or more RMMs need to be connected to Ethernet to allow aut
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 39Figure 26 Daisy-Chain Examples Spare Daisy Control Chain with Multiple
40 • Chassis and Blade Installation R-Series Data Center Products User’s GuideR3040S CablingBecause R3040S blades use two slots in a chassis, the rea
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 41blade and client are on the same subnet or, if they are on different su
42 • Chassis and Blade Installation R-Series Data Center Products User’s GuideMAC Address Label on R-Series BladesA label on the exterior of each R-s
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 43R1350 LabelsThe following figure shows the label on the blade exterior
44 • Chassis and Blade Installation R-Series Data Center Products User’s GuideHow OS Network Connections Are Mapped to NICs on Chassis BackpackAfter
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 453. Telnet into the Primary RMM and verify your RMM firmware version. a.
R-Series Data Center Products User’s Guide Contents • viiReturn Merchandise Authorization (RMA) . . . . . . . . . . . . . . . . . . . . . . . . . . .
46 • Chassis and Blade Installation R-Series Data Center Products User’s Guide2. Unzip the update package and read the enclosed Technical Bulletin (a
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 47RMMs can only be installed in R4300 chassis. A BSBP without an RMC inst
48 • Chassis and Blade Installation R-Series Data Center Products User’s Guide• Do not use Mixed Mode (connecting a mix of R4300s, BSBPs, and/or DCBP
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 49The following figure shows the list of configuration parameters.Figure
50 • Chassis and Blade Installation R-Series Data Center Products User’s GuideRMMGateway RMM Gateway Ignored if IP Mode = DHCP 192.168.1.1 RMMLocat
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 51Configuring the RMC The following steps outline the process required to
52 • Chassis and Blade Installation R-Series Data Center Products User’s Guide• Configure the Blade Switching BackPack for Various Modes: Configurati
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 53each RMC with a different IP address. This allows you to log in to each
54 • Chassis and Blade Installation R-Series Data Center Products User’s GuideThe result should be:>1new ip:4. Type in the desired new IP address.
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 55Connect the CONTROL IN port to your regular network using a standard ne
viii • Contents R-Series Data Center Products User’s Guide
56 • Chassis and Blade Installation R-Series Data Center Products User’s Guide6. Remove the 2 Phillips screws retaining the BackPack. 7. Pull the Bac
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 57Fiber Transceiver and Cable RequirementsSee ClearCube F6150 Fiber Trans
58 • Chassis and Blade Installation R-Series Data Center Products User’s GuideThe fiber optic cables from the output of the Transceiver can be home r
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 59To install a blade, do the following:1. Lower the front bezel on the ch
60 • Chassis and Blade Installation R-Series Data Center Products User’s GuideWhen a blade is inserted into a chassis, it takes approximately 30 seco
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 61To connect C/Ports to a dual-slot blade, use only the even-numbered C/P
62 • Chassis and Blade Installation R-Series Data Center Products User’s GuideWhen connecting to an R3040S, use the even-numbered USB ports on the ba
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 63two or more DVI-I displays to your PCoIP client. Perform the following
64 • Chassis and Blade Installation R-Series Data Center Products User’s GuideFrom the BIOS setup utility you can configure boot sequence, hard disk
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 65Figure 33 Model R1350 MSL and CMOS Jumper Locations and SettingsCleari
R-Series Data Center Products User’s Guide Introduction • ixIntroductionHow to Use this GuideThank you for purchasing your quality ClearCube products
66 • Chassis and Blade Installation R-Series Data Center Products User’s GuidePerform the following steps to clear all CMOS settings.1. Power down th
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 67ClearCube blade image and from the ClearCube Support Web site before yo
68 • Chassis and Blade Installation R-Series Data Center Products User’s Guide10. Press F10 to save your changes and exit Setup.11. Select OK and the
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 693. From the Name field, type a name for the RAID volume you are creatin
70 • Chassis and Blade Installation R-Series Data Center Products User’s GuideFrom the Support site, click PC Blades > R3040S > Drivers and the
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 717. Setup displays a screen requesting that you specify the SCSI adapter
72 • Chassis and Blade Installation R-Series Data Center Products User’s GuideMSL is disabled by default. To enable MSL, you must set a jumper on the
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 73– R1350 Using a C/PortMSL header JP6 is located to the left of the DIMM
74 • Chassis and Blade Installation R-Series Data Center Products User’s Guide– R3040SMSL header JP6 is located near the top edge of the motherboard,
R-Series Data Center Products User’s Guide Chassis and Blade Installation • 75Flashing the Blade BIOSYou can flash (install or re-install) the BIOS f
Comments to this Manuals